01 July 2010

Hobbs Day 2 and 3

Day 2 was scrubbed at the meeting and then it rained all day.

Day 3 the forecast is not optimistic the TAF calls for TSRA and BKN035, OVC 050 CB but we have a grid time set for 1300 in case we can get a 2 hr MAT later this afternoon.

We launched at 1530 after the sniffer reported climbing through 3000 AGL.  I was 8th to launch and off tow, the most I could climb to was 2500 AGL before I was at cloudbase.  About 30 minutes after I launched the day was scrubbed.
 
 
Dave

No comments:

Post a Comment